IFF PROJECT NEW HYDROGENATION PLANT

CONSTRUCTION OF NEW HYDROGENATION PLANT H830

Company:

IFF BENICARLÓ S.L.

Location:

BENICARLÓ (CASTELLÓN)

Project status:

FINISHED 2020

Business area:

MAIN CONTRACTOR. INDUSTRIAL. ENERGY

Project description:

Supply, construction and testing of new hydrogenation equipment at the chemical plant in Benicarló (Castellón). It includes all coordination work in the construction of both the building structure and labour, as well as heating work.
Our company executed the installation work of each of the main elements that make up the process (hydrogenator, filters and tanks), as well as the construction of all the piping of each of the utilities and processes. Likewise, the energy department built the electrical cabinets for both control and power systems. In addition to this, the pipes, the wiring and connection of the different elements were installed. Testing and commissioning of the facilities.

Related projects

Specialities

LANZAS TECNOLOGÍA CPT (CONE PENETRATION TEST)

El ensayo de penetración estática permite determinar de forma continua la presión necesaria para introducir el cono, el rozamiento lateral y la presión de poro. Con estos parámetros es posible determinar y caracterizar los tipos de suelos presentes en el subsuelo de forma continua.
Los elementos son depositados en el fondo marino desde el buque sísmico mediante una grúa y sus correspondientes cables de acero, así como son controlados desde a bordo.

MESA VIBRATORIA

• Chasis de acero al carbono de alta resistencia y gran estabilidad.
• Pintado mediante sistema de pintura en polvo, recubrimiento termoestable exento de disolventes, obteniéndose un revestimiento de alta calidad.
• Sistema vibratorio mediante un Vibrador eléctrico externos, consiste en un motor eléctrico alojado en una robusta carcasa en fundición, con pesos excéntricos colocados en ambos extremos del eje.
• Robusto sistema de sujeción de la lanza. Regulable en posición y ligero.
• Motor accionado mediante variador de frecuencia. Permite regular la velocidad del motor de una manera sencilla y cómoda. Máxima eficiencia y control del proceso de simulación de la vibración de la lanza.
• Panel de control de fácil acceso y maniobra. Ciclos de trabajo configurables.
• Alimentación a 230v ac 50-60hz.Cuenta con dos fuentes de alimentación de salida, 24v y 15v dc

WINCHES

Outstanding features:
Umbilical cable weight: 1.1-1.2 kg/m
Maximum traction force 11kn (first layer)
General dimensions (approx. 2000 x 1700 x 2000 mm)
Helicoidal gear box
8 ISO 1161:1984 corner castings with rotating lock
Working load limit with 4 lifting points.

CONE ALPHA

• Construido íntegramente en AISI 316. Diseño robusto.
• Equipado con bomba manual de presión de altas prestaciones (100 bar).
• Compatible con todos los fabricantes de lanzas del mercado.
• El fluido de prueba trabaja en circuito cerrado, sin posibilidad de fugas.
• Transportable mediante maleta de duraluminio de alta resistencia (incluida).
• Respetuoso con el medioambiente puesto que no precisa de aceites ni elementos contaminantes.

CONTAINERIZED LABORATORY

Mobile maritime laboratories are used to carry out the on-site study of the parameters collected by CPT equipment. Recorded signals undergo specialized processing and interpretation to obtain understandable information about the subsoil.
The modular design of the container allows us to adapt it to the most demanding customer needs during manufacture.

V3 SEISMIC SOURCE

Seismic sources can provide individual pulses, generating seismic waves that travel through a medium such as water or rock layers. Some of the waves are reflected, refracted and recorded by receivers, such as geophones or hydrophones. These sensors, in the form of a lance, are nailed to the subsoil by drilling equipment.