Installation of a Transformation centre for energy management in an electrical generation system using roof mounted photovoltaic modules to inject the energy into the network of ELECTRA DEL MAESTRAZGO.
The work consisted of the installation of a 20/0.4kV MT/BT Reducer Transformation centre installed in a precast concrete building, with a power of 250kVA and cooled by oil bath with integral filling technology.